Labels: , ,

Case Study - Lambeth Hospital, London

Airtherm worked closely with the contractor AC Preou Limited with the supply and installation of two boiler house refurbishments of Reay House and Oak House at Lambeth Hospital, London.

The existing plant was removed by the contractor and replaced with a more modern, efficient system supplied by Ideal commercial. Airtherm installed both flue systems simultaneously and completed the works within two working days to meet with the client's schedule of works.


Project Details:
Client: Lambeth Hospital
Contractor: AC Preou Limited
Sector: Primary Health Care
Products: Masterflue
Equipment: Ideal Boilers
Application: Atmospheric

Boilers: Ideal
Model: Concord
Application: Chimney / Flue system
Operating mode: Dry
Pressure: Negative pressure
Working pressure: 50 Pa (product will operate 300pa max)
Inner wall: 316L1.4404/1.457 thickness 0,6 mm
Outer wall: 304/ 1.4301 thickness 0,5
Insulation: 25mm thick Rockwool insulation
Sealant: Tri-lip 'o' type silicone ring
Fuel type: Gas
Fan Assisted: Bifurcated

Other Application our MF Flues can be used:

  • Condensing boilers
  • Atmospheric gas-fired boilers
  • Gas blown boilers
  • Industrial ovens, large-scale establishments
  • Wood-fired stoves
For more information: www.airtherm.co.uk

0 comments:

Post a Comment