Labels: , ,

Case Study - Camden Academy, London

Airtherm Engineering Limited have designed, supplied and installed a 500mm diameter stainless steel, twin wall, fully welded gas and water tight Dinak DWhp flue system serving three high efficiency Clyde condensing boilers, with a total 2.2MW output load.

The system installed comprised of a 10m horizontal run and a 26m vertical, complete with the necessary drains incorporated to allow any unwanted condense to evacuate to the system.

The system was installed back in April 2012. Working closely with BAM Construction the installation was certainly a success.

The UCL Academy will be housed in brand-new, purpose-built accommodation on Adelaide Road in Swiss Cottage, North London.

The new building is specifically designed to support the curriculum and pastoral structures that the school will offer.

The Academy’s facilities include:


• State-of-the-art science laboratories, and a science demonstration theatre for interactive lectures, experiments and talks by visiting academics from UCL;


• An engineering science suite, which will include workshops and technology and science labs (for electronics and for engineering physics) designed to give students the experience of ‘being engineers’;


• Suites of rooms for art, music and drama, including highly-equipped performance spaces;


• ‘House’ spaces, providing comfortable, welcoming places for students to eat together, and to use for informal study during breaks and before and after school.

0 comments:

Post a Comment