Airtherm Engineering Limited has recently completed a flue dilution installation, working closely with the consultant and contractor at Grange Farm Primary School, Coventry.
The flue system selected for the project needed to be aesthetically pleasing, discreet and blend in with the building features, so a dilution system was chosen over a traditional system, which the client was in total agreement.
Airtherm provided design calculations for the project using the latest iCalc sizing package, along with compressive technical submission and Auto Cad drawings for approval prior to manufacture and ordering of the equipment.
The flue system installed comprised of a 300mm diameter fully welded dilution header, flatk Woods bifurcated epoxy coated fan, stainless steel silencers, volume control regulators and supply and discharge louvres, situated 2m from ground level to comply with Clean Air Act Memorandum.
Consultant
IDP Midlands
Client
Mitie Build
Sector
Education
Products
MasterFlue System
Equipment
Mikrofill Ethos 90kw
Application
High Efficiency Condensing
Boilers
Mikrofill -
• Model: Ethos 90kw
• Application: Flue Dilution System
• Operating mode: Wet
• Pressure: Negative / positive pressure
• Working pressure: 200 Pa (product will operate 1000pa max)
• Inner wall: 316L Stainless Steel fully welded
• Sealant: tri-lip 'o' type silicone ring
• Fuel type: Gas
Considerations
Airtherm can offer a fan dilution system to suit many appliances, from modern high efficiency condensing to gas blown and atmospheric boilers, however the principal of diluting the products of combustion is to reduce the CO² content at the discharge to below 1%, CO 50ppm & NOx 5ppm (BS6644 / IGEUP/10) in line with current legislation.
There are many design considerations that must be achieved, for instance, the correct sizing of the fan unit, dilution header, inlet and discharge plenum boxes, the location to adjacent buildings, openable windows, fresh air vent pipes and final discharge height. These can be found from the Clean Air Act memorandum, IGEUP/10 or BS6644, along with other certain provisions with respect to the final discharge height which is calculated based on the total kw input load of the plant.
Good Practice
There are two methods that can be considered when designing the dilution system -
• Air is directly taken from the outside.
• Fresh air is taken from within the plant area.
We offer a design, supply and installation service for flue dilution systems, and can offer a tailored-made package to site conditions and customer requirements.
www.airtherm.co.uk
Pages
Labels:
Flues,
Grange Farm Primary,
Masterflue,
Twin Wall
Case Study - Grange Farm Primary School, Coventry
Posted by
Airtherm Engineering Ltd
Monday, 22 October 2012
Subscribe to:
Post Comments (Atom)
Blog Subscription
-
Follow me
You can follow my updates on Twitter
-
Join My Network
Be a part of our business network
-
Facebook
Become a fan of our blog on Facebook
Search this blog
Popular Posts
-
Our new Natural Ventilation brochure for 2014 is available to download from our website. Our Natural Ventilation & Lighting brochure...
-
Airtherm Engineering recently completed the installation of a twin wall, fire rated, flue system at the new £20 Million Signature Care Home ...
-
Airtherm Engineering has completed another installation using Nova commercial product serving two existing Potteron Derwent atmosperic boi...
-
Airtherm Engineering Ltd are proud to announce that we have successfully achieved the SAFEcontractor accreditation for 2014. This means ...
-
Airtherm Engineering Limited are pleased to announce the appointment of Mr Richard Hattersley, who joins our business in the capacity of A...
-
You can now find our new Company Brochure on our website in the Downloads menu. There are two versions available, a shorter, introductory c...
-
Airtherm Engineering Limited has recently completed a flue dilution installation, working closely with the consultant and contractor at Gra...
-
Airtherm Engineering Limited is proud to announce our award for accreditation from Safecontractor for its commitment to achieving excellenc...
-
Airtherm are pleased to announce the appointment of David Brown, who joins our vibrant and enthusiastic team of individuals, in the capaci...
-
Airtherm are pleased to announce the appointment of Carl Gipson who joins our vibrant and enthusiastic team of individuals, in the capacity ...
Labels
- Accreditations (1)
- Addensbrooke House (1)
- Air Conditioning (3)
- Air Source Heat Pumps (2)
- Ansul (1)
- Broag (1)
- Broag Remeha (1)
- Camden Academy (1)
- Can-iVent (1)
- CanVent (2)
- Capel Manor (1)
- Case Studies (1)
- CHAS (1)
- Chimneys (5)
- CIBSE (3)
- Clyde (2)
- Comfort Cooling (3)
- Construction Online (1)
- Control Systems (3)
- David Brown (1)
- Fire Suppression (1)
- Flues (23)
- Grange Farm Primary (1)
- Grilles (1)
- Hamworthy (5)
- Heat Pumps (2)
- Heat Recovery (1)
- Kitchen Canopies (10)
- Kitchen Ventilation (9)
- Louvres (1)
- Masterflue (10)
- Natural Lighting (4)
- Natural Ventilation (11)
- New address (1)
- Nova (2)
- Photovoltaic (2)
- Quick installation (1)
- Renewables (4)
- Safecontractor (3)
- Sales Agents (6)
- Single Wall (2)
- Solar PV (2)
- Solatube (1)
- Tividale Hall Primary School (1)
- Twin Wall (14)
- Ventilation (5)
- Wind-iCalc (4)
- Wind-iVent (8)
Blog Archive
-
▼
2012
(21)
-
▼
October
(9)
- Case Study - Swan Lane First School, Evesham
- Case Study - Grange Farm Primary School, Coventry
- Case Study - Elmhurst Primary School, Newham, London
- Case Study - St Bernard’s Catholic School, Birmingham
- Case Study - St Gregory's RC School, Birmingham
- Case Study - Oakham Primary School, Dudley, West M...
- Case Study - King Edward High School, Edgbaston, B...
- Case Study - Camden Academy, London
- Case Study - Tividale Hall Primary School, Oldbury
-
▼
October
(9)
0 comments:
Post a Comment