Labels: ,

Case Study - Oakham Primary School, Dudley, West Midlands

Airtherm have recently designed, supplied and installed a complete twin wall stainless steel flue system serving each MHS Adinox ADI LT 200 modulating boiler at Oakham Primary School in Dudley in the West Midlands.

This installation of a 10m, 3nr MHS Adinox ADI LT 200 flue for a gas condensing boiler system comprised of a twin wall insulated stainless steel pre-fabricated exhaust system, manufactured from a 0.6mm grade 316L inner liner and a 0.4mm grade 304L outer case with the 37.5mm void packed of 128kg/m3 high density insulation.

The system used gives a positive pressure resistance of up to 2KPa and a continuous high temperature capability of up to 760°C independently tested to BS 476: Part 24 for 4 hours.


All of the products used are approved and CE marked to EN 1856-1 and manufactured under a quality assurance scheme, administered by British Standards in accordance with BS EN 9001: 2008.

Airtherm Engineering Ltd only uses branded products which are synonymous with the highest quality - in this case the Dinak product range of flue, chimney and exhaust solutions - and it is this reputation that enables specifiers and contractors to use our versatile product range with total confidence

We can provide technical solutions for the specialist areas of high temperature exhaust systems, serving generators & combined heat and powder units, fan assisted, flue dilution and atmospheric applications.

Our installation teams are made up of experienced personnel that are fully trained and aware of all the necessary statutory requirements and standards for every project they undertake.

Each team member holds the correct qualifications for his or her job. All of our engineers are competent in their field and carry all necessary site certification with CSCS cards, IPATH, PASMA and scaffold towers. Our engineers strive towards excellence in each and every project they undertake.


Comprehensive Method Statements & Risk Assessment are generated for each and every project, and issued to our clients and installation team members.

0 comments:

Post a Comment