Flues and Chimneys

Flues and Chimneys

Labels: , , ,

Natural Ventilation brochure 2014

1 comments

Our new Natural Ventilation brochure for 2014 is available to download from our website. Our Natural Ventilation & Lighting brochure features a comprehensive look at the various natural ventilation & lighting solutions we offer that are ideally suited for schools, hospitals, offices, gymnasiums and commercial premises as well as many more applications. Natural energy solutions detailed...

Labels:

SAFEcontractor Accreditation - Health and Safety 2014

0 comments

Airtherm Engineering Ltd are proud to announce that we have successfully achieved the SAFEcontractor accreditation for 2014.  This means we have proven our competence and ability to adequately manage and control the Health & Safety to our workforce. SAFEcontrator are the recognised market leader for contractor’ Health & Safety pre-qualification in the UK. The company’s application for...

Labels: ,

Case Study - Tipton Hospice, West Midlands

0 comments

Airtherm Engineering have recently completed the new installation of a natural ventilation system at Tipton Hospice for local firm Cockbill Grant Limited (based in Rugeley, Staffordshire). Airtherm beat our local competition based on our knowledge, experience and technical ability providing detailed design proposals for the client’s consideration. The Wind-iVent units selected for the project were...

Labels: ,

Case Study - John Roan School, Greenwich

0 comments

Airtherm have installed a new Wind-iVent natural ventilation system at John Roan school in Greenwich, London. Founded in 1677, the John Roan School is one of the oldest state schools in the country, with a rich and distinguished past. Having recently received funding under the government’s Building Schools for the Future initiative, the school is on the cusp of opening the doors on one of the...

Labels: , ,

Case Study - Marlow Care Home, Bucks

0 comments

Airtherm Engineering recently completed the installation of a twin wall, fire rated, flue system at the new £20 Million Signature Care Home for Marlow. Signature Senior Lifestyle are currently finalising the construction of the care home located on Little Marlow Road in Marlow, Buckinghamshire. The new heating system comprises of a new gas fired boiler and two new Broag water heaters, all located...

Labels:

New Sales Agent - Oxfordshire, Berkshire & Buckinghamshire and Yorkshire & Humberside

0 comments

Airtherm are pleased to announce the appointment of Carl Gipson who joins our vibrant and enthusiastic team of individuals, in the capacity of ‘Area Sales Agent’. Carl will cover the Oxford, Buckinghamshire, Berkshire, Yorkshire & Humberside areas. Carl has over 30 years technical sales experience in the commercial and industrial ventilation sector. He has worked for some well-known blue chip...

Labels: , ,

Case Study - Lambeth Hospital, London

0 comments

Airtherm worked closely with the contractor AC Preou Limited with the supply and installation of two boiler house refurbishments of Reay House and Oak House at Lambeth Hospital, London.The existing plant was removed by the contractor and replaced with a more modern, efficient system supplied by Ideal commercial. Airtherm installed both flue systems simultaneously and completed the works within two...

Labels: ,

Case Study - Trinity Catholic College, Leamington Spa

0 comments

Airtherm have recently designed, supplied and installed a complete twin wall stainless steel flue system serving each Hamworthy Fleet 350 condensing boiler at Trinity Catholic School, Leamington Spa, Warwickshire.Trinity Catholic School is a mixed Catholic secondary school in Leamington Spa, Warwickshire, England. The school had Technology College status awarded in 2000 and Arts College status awarded...

Labels: ,

Case Study - Windrush Primary School, Woolwich

0 comments

This project involved the removal of the existing twin wall header system and the installation of a new twin wall four hour fire rated system to serve two MHS Ultragas condensing boilers.Airtherm had to undertake a CCTV survey to establish to condition of the existing chimney and to ensure the new liner would pass down the stack without any obstruction. The existing 24m high brick built chimney is...

Labels: ,

Case Study - Coppice Primary School, Wythall (2nd Phase)

0 comments

Airtherm have already completed the 1st phase works by installing two ‘Wind-iVent’ Systems to the newly completed single storey class rooms. The 2nd phase fix features a further six 1.2msq units for the Hall area, which will be used mostly by the Church, and a further six 1.1msq units serving the Classrooms.The new installation of fourteen natural ventilation systems for MVS Limited had been designed...

Labels: , , , ,

Case Study - Colegrave School, Newham, London

0 comments

Airtherm Engineering's track record of successful and efficient projects was demonstrated by the recent installation of our 'Can-iVent' island kitchen canopy system at Colegrave Primary School in Newham, London. The project involved the successful liaising between Fowler Martin, AC Preou Limited and Newham Council (consultant, contractor and client, respectively).Airtherm Engineering Limited liaised...

Labels: ,

Case Study - Blyth Sports Centre, Northumberland

0 comments

Area Sales Engineer Jim Keady initially liaised with both the consultant and the contractor at the early design stage to establish the full requirements for this project. Airtherm then attended site to complete a survey and based upon our findings a full specification and design proposal was issued to the consultant for consideration. Airtherm were specified by Screen & Partners to carry out...