Airtherm Engineering recently completed the installation of a twin wall, fire rated, flue system at the new £20 Million Signature Care Home for Marlow. Signature Senior Lifestyle are currently finalising the construction of the care home located on Little Marlow Road in Marlow, Buckinghamshire.
The new heating system comprises of a new gas fired boiler and two new Broag water heaters, all located in the basement boiler house. The twin wall fire rated flue systems rise through the three storey building approx 14m, exiting through a flat roof and are then offset to the taller structure, terminating at 1m above the structure in compliance with the Clean Air Act Memorandum.
Project Details:
Consultant: ABCE UK
Client: LLJ Limited
Sector: Healthcare
Products: DWhp
Equipment: Broag boiler & A.O Smith water heaters
Application: High Efficiency Condensing
Boiler: Broag
Model: 610-8
Water Heater: A.O Smith
Model: BFC60
Application: Chimney / Flue system
Operating mode: Wet
Pressure: positive pressure
Working pressure: 150 Pa (product will operate 300pa max)
Inner wall: 316L1.4404/1.457 thickness 0,6 mm
Outer wall: 304/ 1.4301 thickness 0,5
Insulation: 30mm thick Rockwool insulation
Sealant: Tri-lip 'o' type silicone ring
Fuel type: Gas
For more information: www.airtherm.co.uk
Labels:
Flues,
Twin Wall
This project involved the removal of the existing twin wall header system and the installation of a new twin wall four hour fire rated system to serve two MHS Ultragas condensing boilers.
Airtherm had to undertake a CCTV survey to establish to condition of the existing chimney and to ensure the new liner would pass down the stack without any obstruction.
The existing 24m high brick built chimney is lined throughout with our single wall fully welded product suitable for the application. Our experience team of fitting engineers used a chain block to lower the sections down the stack until reaching the base, completed using a top stub termination cowl and flashing plate.
Project Details:
Consultant: Billingford Limited
Client: CBM Serv Limited
Sector: Education
Products: DW & ME
Equipment: MHS Ultragas R605
Application: High Efficiency Condensing
Boilers: MHS
Model: R605
Application: Chimney / Flue system
Operating mode: Wet
Pressure: Positive pressure
Working pressure: 150 Pa (product will operate 300pa max)
Inner wall: 316L1.4404/1.457 thickness 0,6 mm
Outer wall: 304/ 1.4301 thickness 0,5
Insulation: 30mm thick Rockwool insulation
Sealant: Tri-lip 'o' type silicone ring
Fuel type: Gas
Chimney: Single wall fully welded stainless
Other Applications suitable for our DW and ME Flues:
- Condensing boilers
- Atmospheric gas-fired boilers
- Gas blown boilers
- Industrial ovens, large-scale establishments
- Wood-fired stoves
For More information: www.airtherm.co.uk
Labels:
Flues,
Twin Wall
Area Sales Engineer Jim Keady initially liaised with both the consultant and the contractor at the early design stage to establish the full requirements for this project.
Airtherm then attended site to complete a survey and based upon our findings a full specification and design proposal was issued to the consultant for consideration. Airtherm were specified by Screen & Partners to carry out the works in conjunction with the nominated contractor Kirkland (Blyth) Limited.
The recent completion of the two twin wall flue systems ran smoothly from start to finish with the client commending our installers: “We would definitely be using Airtherm again in the near future”.
Project Details:
Consultant: Screen & Foster Partners
Contractor: Kirkland (Blyth) Limited
Sector: Leisure
Products: Twin Wall Flue
Equipment: Hoval Ultragas 650D
Application: Condensing
Boilers: Hoval
Model: Ultragas 650D
Application: Chimney / Flue system
Operating mode: Wet
Pressure: Positive pressure
Working pressure: 130 Pa (product will operate 300pa max)
Inner wall: 316L1.4404/1.457 thickness 0,6 mm
Outer wall: 304/ 1.4301 thickness 0,5
Insulation: 30mm thick Rockwool insulation
Sealant: Tri-lip 'o' type silicone ring
Fuel type: Gas
Other Application suited to our DW Flue solutions:
- Condensing boilers
- Atmospheric gas-fired boilers
- Gas blown boilers
- Industrial ovens, large-scale establishments
- Wood-fired stoves
For more information: www.airtherm.co.uk
Labels:
Chimneys,
Clyde,
Flues,
Single Wall,
Twin Wall
Airtherm Engineering are proud to announce the formation of a new and exciting partnership with Clyde Energy Solutions.
The combination of Airtherm's high quality products and services at affordable prices and Clyde's 90+ years experience in supplying and servicing commercial and industrial heating systems will benefit both of our mutual customers.
“This was not a hard decision for us, a well-known brand such as Clyde, with a long standing reputation in the industry... Airtherm had no hesitation to enter into a partnership to strengthen our position in the marketplace,” commented Andrew Brown, Airtherm's Managing Director.
“Clyde has a reputation for innovation and a consistently reliable service, supplying boilers and water heaters with a variety of Renewable Energy Solutions that meet customer expectation's. Our role at Airtherm will be to provide technical support, comprehensive proposals and cost-effective quotations for chimney and flue solutions, to our client’s throughout the UK.”
“Airtherm Engineering Ltd only uses branded flue and chimney products which are synonymous with the highest quality and it is this assured reputation that attracted Clyde to use our versatile product range on their boiler and water heaters with total confidence.”
For more information: www.airtherm.co.uk
Labels:
Flues,
Masterflue,
Natural Lighting,
Solatube,
Twin Wall
Airtherm Engineering Limited worked with Trendgrey Construction Limited to complete the installation of a twin wall stainless steel, four hour fire rated flue installation at Crackley Hall School, Kenilworth. We also installed our Solatube Day Lighting system in several classrooms and corridors.
The new extensions at Crackley Hall School will provide new specialist classrooms, a new hall and music centre. As Crackley Hall is a historic building and is set within a residential context, we worked closely with our client and the local planning authority to develop an appropriate solution for the termination of the products of combustion.
Consultant: Ridge & Partners
Client: Trendgrey Ltd
Sector: Education
Products: MasterFlue System / Solatube Daylight Systems
Equipment: Ideal Harrier / Solatube 160DS
Application: Blown Gas / Flat Roof
Flue solution -
Water Heater: Ideal Cast Iron Boiler
Model: GT Harrier 5
Application: Chimney / Flue system
Operating mode: Dry
Pressure: Negative
Working pressure: 200 Pa (product will operate 1000pa max)
Inner wall: 316L1.4404/1.457 thickness Ø250 0,4 mm
Outer wall: AISI 304/ 1.4301 thickness 0,5mm
Insulation: 25mm thick
Sealant : Tri-lip 'o' type silicone ring
Fuel type: Gas
Lighting solution -
Product Type: Solatube
Model: Solatube 160DS
Light Coverage: 1032sq m (each)
Number of Solatubes: 5off systems
Location / Areas: Classroom & Corridor
Roof Application: Flat
Roof Type: Sarnafil
Day Lighting systems actively capture daylight from the rooftop and project through a highly reflective tubing to where it’s needed. Solatube light tube system uses the most advanced technologies to ensure that the efficiency and performance of their systems is unrivalled.
Extension tubes are available in lengths of 610mm (straight) or 380mm long incorporating a 0-30° adjustable angle along with the new 0-90° angle unit. All reflective tubes – including adjustable tubes – are manufactured from 99.7% reflective Spectralight Infinity material, allowing tube lengths of up to 15 metres for the SolaMaster 330 DS.
OPTIVIEW® DIFFUSERS
The technologically advanced OptiView® diffuser uses a multiple Fresnel lens system with a stunning architectural look to deliver crystal clear daylight.
For more information: www.airtherm.co.uk
Labels:
Chimneys,
Flues,
Masterflue,
Twin Wall
During September 2012, Airtherm Engineering Limited completed a flue installation at All Saints Primary School, Maidenhead, ready for the return of pupils from the summer shut-down.
The Masterflue system installed incorporated a draft stabiliser, as recommended within the manufactures operating and maintenance literature for balancing purposes.
Due to the close proximity of a kitchen ventilation intake (AHU) - approx. 5m distance - the flue system couldn't simply terminate above the flat roof as standard. Instead, our solution was to incorporate an offset towards the taller structure with the twin wall flue system fixed and secured to the existing brick stack.
Consultant: Maidenhead Council
Client: Perfect Pipework Ltd
Sector: Education
Products: MasterFlue System
Equipment: A.O. Smith COF315
Application: Atmospheric
Water Heater: AO Smith
Model: COF315
Application: Chimney / Flue system
Operating mode: Dry
Pressure: Negative
Working pressure: 200 Pa (product will operate 1000pa max)
Inner wall: 316L1.4404/1.457 thickness Ø250 0,4 mm
Outer wall: AISI 304/ 1.4301 thickness 0,5mm
Insulation: 25mm thick Rockwool insulation
Sealant : Tri-lip 'o' type silicone ring
Fuel type: Oil
Other Application METALOTERM MasterFlue:
• Condensing boilers
• Atmospheric gas-fired boilers
• Gas blown boilers
• Industrial ovens, large-scale establishments
• Wood-fired stoves
• Other Advantages METALOTERM MasterFlue
• No terminal bridges, better heat protection
• High-temperature silicone sealing ring
• Fast-build system without the need of sealants
• High quality insulation uninterrupted from base plate to top stub
For more information: www.airtherm.co.uk
Labels:
Flues,
Twin Wall
Chimney and flue specialist Airtherm Engineering Limited was appointed, in August 2012, as the preferred flue installer at a new Mansion Studios refurbishment in the City Centre of Nottingham.
Bowman House is
an existing 1970’s, 4-storey office building which has been converted
into 140 one-bed studios for students. The building is now known as
Mansion Studios.
The brief was to design, supply and install two twin wall stainless steel insulated flue systems, each serving high efficiency heatmaster boilers and a chp unit, all located in the basement of the building.
The boiler house was extremely congested and gave our installation team a challenging time, but due to their experience we overcame the obstacle's and completed on-time.
Both systems complying with BS & Clean Air Act Memorandum.
Consultant
Clancy Consulting
Client
MVS Limited
Sector
Education
Products
Dinak DWHp
Equipment
3 x Heatmaster 85T
1 x ENER-G E25 CHP
Application
Condensing
Boilers: Heatmaster 85T
CHP: ENER-G E25
Model: Modulex 1 x 290kw & 2 x 900kw
Application: Chimney / Flue system
Operating mode: Dry / Wet
Pressure: Negative Pressure
Working pressure: 200 Pa (product will operate 1000pa max)
Inner wall: 316L1.4404/1.457 thickness
Outer wall: AISI 304/ 1.4301 thickness 0,5
Insulation: 30mm thick Rockwool insulation
Sealant: Tri-lip 'o' type silicone ring
Fuel type: Gas
For more information: www.airtherm.co.uk
Labels:
Broag Remeha,
Capel Manor,
Masterflue,
Twin Wall
Airtherm Engineering Limited has recently completed a twin wall fire rated flue installation at Capel Manor Primary School in Enfield. The flue system selected was from the ‘Masterflue’ range.
The Remeha Gas 210 Eco Pro boilers used at the school are a compact floor standing condensing boiler. The small footprint and ability to be installed back to back makes them ideally suited for fluing.
The client requested Airtherm to attend site, prepare and return a fully comprehensive tender, in which design calculations were carried out ensuring the system was adequately sized to convey the products combustion to atmosphere. Due to the huge bulk stock levels in this particular ‘MF’ and our capabilities in reacting quickly, our dedicated team of time served engineers accomplished the mission to our client’s delight.
We are delighted with our performance once again and look forward to working with the client again.
Consultant: T&B Limited
Client: Perfect Pipework Ltd
Sector: Education
Product: MasterFlue System
Equipment: 2nr Broag Eco 210-6 section boilers
Application: High Efficiency
Boilers: Broag Remeha
Model: Eco 210-6
Application: Chimney / Flue System
Operating mode: Wet
Pressure: Positive pressure
Working pressure: 200 Pa (product will operate 1000pa max)
Inner wall: 316L1.4404/1.457 thickness ≤ Ø250 0,4 mm, ≥ Ø300 0,5 mm
Outer wall: AISI 304/ 1.4301 thickness 0,5 / 0,6 mm
Insulation: 25mm thick Rockwool insulation
Sealant: Tri-lip 'o' type silicone ring
Fuel type: Gas
For more information please visit - www.airtherm.co.uk
Labels:
Addensbrooke House,
Flues,
Hamworthy,
Twin Wall
Airtherm Engineering Limited has recently completed a flue installation, working closely with the contractor at Addensbrooke House, Telford, Shropshire.
The flue system(s) selected was the ‘Masterflue’ by Hamworthy Heating used on their own boiler range.
The flue system installed is serving four new high efficiency condensing boilers and comprises of a twin wall stainless steel inner & outer casing with 25mm insulation. The flue system has a 3.5m horizontal and a 2.5m vertical run, incorporating the necessary drains to allow any unwanted condense to evacuate the system.
Also in the same plant room is a Hamworthy DR-LA 75 water heater which Airtherm has supplied and installed a twin wall stainless steel flue system from the appliance to termination. Both systems comply with BS & Clean Air Act Memorandum.
Consultant
Telford & Wrekin Council
Client
TDR Mechanical Limited
Sector
Education
Products
MasterFlue System
Equipment
Hamworthy PV105c
Application
Condensing
Boilers: Hamworthy
Model: Modumax Variheat PV105
Application: Chimney / Flue system
Operating mode: Wet
Pressure: Negative / positive pressure
Working pressure: 200 Pa (product will operate 1000pa max)
Inner wall: 316L1.4404/1.457 thickness Ø300 0,5 mm
Outer wall: AISI 304/ 1.4301 thickness 0,5 / 0,6 mm
Insulation: 25mm thick Rockwool insulation
Sealant: Tri-lip 'o' type silicone ring
Fuel type: Gas
Labels:
Flues,
Twin Wall
The flue system selected was a stainless steel fully welded twin wall 4 hour fire rated system with 30mm insulation.
Airtherm provided a cost-efficient solution for the client and furthermore we exceeded their expectations when our tender was some margin under the original budget offered by the Hamworthy flue division.
The flue system installed comprised of a 2.5m horizontal run and a 3m vertical, incorporating the necessary drains to allow any unwanted condense to evacuate the system.
Consultant
Worcestershire Council
Client
EMS
Sector
Education
Products
MasterFlue System
Equipment
Hamworthy PV110c
Application
Condensing
Boilers: Hamworthy
Model: Modumax Variheat PV110c
Application: Chimney / Flue system
Operating mode: Wet
Pressure: Negative / positive pressure
Working pressure: 200 Pa (product will operate 1000pa max)
Inner wall: 316L1.4404/1.457 thickness ≤ Ø250 0,4 mm
Outer wall: AISI 304/ 1.4301 thickness 0,5 / 0,6 mm
Insulation: 30mm thick Rockwool insulation
Sealant: Tri-lip 'o' type silicone ring
Fuel type: Gas
Other Applications for METALOTERM MasterFlue
Condensing boilers
Atmospheric gas-fired boilers
Gas blown boilers
Industrial ovens, large-scale establishments
Wood-fired stoves
Other Advantages of METALOTERM MasterFlue
No terminal bridges, better heat protection
High-temperature silicone sealing ring
Fast-build system without the need of sealants
High quality insulation uninterrupted from base plate to top stub
www.airtherm.co.uk
Labels:
Flues,
Grange Farm Primary,
Masterflue,
Twin Wall
Airtherm Engineering Limited has recently completed a flue dilution installation, working closely with the consultant and contractor at Grange Farm Primary School, Coventry.
The flue system selected for the project needed to be aesthetically pleasing, discreet and blend in with the building features, so a dilution system was chosen over a traditional system, which the client was in total agreement.
Airtherm provided design calculations for the project using the latest iCalc sizing package, along with compressive technical submission and Auto Cad drawings for approval prior to manufacture and ordering of the equipment.
The flue system installed comprised of a 300mm diameter fully welded dilution header, flatk Woods bifurcated epoxy coated fan, stainless steel silencers, volume control regulators and supply and discharge louvres, situated 2m from ground level to comply with Clean Air Act Memorandum.
Consultant
IDP Midlands
Client
Mitie Build
Sector
Education
Products
MasterFlue System
Equipment
Mikrofill Ethos 90kw
Application
High Efficiency Condensing
Boilers
Mikrofill -
• Model: Ethos 90kw
• Application: Flue Dilution System
• Operating mode: Wet
• Pressure: Negative / positive pressure
• Working pressure: 200 Pa (product will operate 1000pa max)
• Inner wall: 316L Stainless Steel fully welded
• Sealant: tri-lip 'o' type silicone ring
• Fuel type: Gas
Considerations
Airtherm can offer a fan dilution system to suit many appliances, from modern high efficiency condensing to gas blown and atmospheric boilers, however the principal of diluting the products of combustion is to reduce the CO² content at the discharge to below 1%, CO 50ppm & NOx 5ppm (BS6644 / IGEUP/10) in line with current legislation.
There are many design considerations that must be achieved, for instance, the correct sizing of the fan unit, dilution header, inlet and discharge plenum boxes, the location to adjacent buildings, openable windows, fresh air vent pipes and final discharge height. These can be found from the Clean Air Act memorandum, IGEUP/10 or BS6644, along with other certain provisions with respect to the final discharge height which is calculated based on the total kw input load of the plant.
Good Practice
There are two methods that can be considered when designing the dilution system -
• Air is directly taken from the outside.
• Fresh air is taken from within the plant area.
We offer a design, supply and installation service for flue dilution systems, and can offer a tailored-made package to site conditions and customer requirements.
www.airtherm.co.uk
Labels:
Flues,
Nova,
Twin Wall

Airtherm Engineering has completed another installation using Nova product serving two high efficiency wall hung Mikrofil Ethos 90kw condensing boilers at St Gregory's RC School in Birmingham.
Nova is a new breed of chimney system that offers a single solution for virtually all of today's combustion requirements. Nova is a true multi-fuel / multi-application product, whether being used to serve a solid fuel stove, vent the latest high efficiency condensing appliances or Biomass wood chip / pellet stove, Nova is the product of choice. With a diameter range covering thirteen sizes, Nova covers domestic and commercial applications. Manufactured from a 316L inner liner, 25mm high density insulated annulus and a grade 304 outer case, Nova is built to last. Unlike some of our competitors, Nova is designed with a rapid fit multi-barbed twist lock jointing system.
This not only offers a fast and simplistic installation method but also a durable and strong joint allowing a free-standing height of up to 3.0 metres to be support above the last support.
When used on appliances which product high levels of condensation, such as highly efficient condensing appliances, Nova can be retrofitted with a seal to allow both positive pressure and condensate resistance up to 200Pa, based on a maximum flue gas temperature of 200°C. Nova is available in thirteen sizes, ranging from 100mm to 600mm internal diameter.
• Suitable for fully condensing applications
• Fully welded construction
• High level insulation
• High thermal resistance
• High speed twist lock jointing system to aid installation
• Without seals the product is suitable for multi fuel applications up to 450°C
Diameters: 100mm - 600mm
Construction: Twin Wall Insulated
Material: 316L stainless steel liner and 304 stainless steel outer case
Temperature: 450°C Continuous without seals 200°C with seals fitted
Pressure capability: 200Pa (P1)
Mode of operation: Negative or positive pressure
Approvals:
BS EN 1856-1 T460 N1 D V2 L50050 G(50) Nova SM
BS EN 1856-1 T600 N1 D V2 L50050 G(50) Nova SF
BS EN 1856-1 T200 P1 W V2 L50050 O(50) Nova SM c/w seals
2 hour fire rating BS476 part 20
CE Requirements:
Ventilated support components must be used where the flue gas temperature exceeds 250°C and where the flue internally passes through a combustible floor. Where used for condensing and positive pressure applications up to 200°C, seals must be utilised
• Suitable for gas, oil and multi-fuel appliances
• When used with seals, suitable for condensing and positive pressure applications up to 200Pa at 200°C
• All components are supplied complete with Locking Bands
• Strong jointing system allowing up to 3.0 metres of unsupported product above the last support
• Rapid twist lock jointing system for ease and speed of installation
• Covers both domestic and commercial applications from 100mm to 600mm internal diameter
Labels:
Flues,
Twin Wall
Airtherm have recently designed, supplied and installed a complete twin wall stainless steel flue system serving each MHS Adinox ADI LT 200 modulating boiler at Oakham Primary School in Dudley in the West Midlands.
This installation of a 10m, 3nr MHS Adinox ADI LT 200 flue for a gas condensing boiler system comprised of a twin wall insulated stainless steel pre-fabricated exhaust system, manufactured from a 0.6mm grade 316L inner liner and a 0.4mm grade 304L outer case with the 37.5mm void packed of 128kg/m3 high density insulation.
The system used gives a positive pressure resistance of up to 2KPa and a continuous high temperature capability of up to 760°C independently tested to BS 476: Part 24 for 4 hours.
All of the products used are approved and CE marked to EN 1856-1 and manufactured under a quality assurance scheme, administered by British Standards in accordance with BS EN 9001: 2008.

Airtherm Engineering Ltd only uses branded products which are synonymous with the highest quality - in this case the Dinak product range of flue, chimney and exhaust solutions - and it is this reputation that enables specifiers and contractors to use our versatile product range with total confidence
We can provide technical solutions for the specialist areas of high temperature exhaust systems, serving generators & combined heat and powder units, fan assisted, flue dilution and atmospheric applications.
Our installation teams are made up of experienced personnel that are fully trained and aware of all the necessary statutory requirements and standards for every project they undertake.
Each team member holds the correct qualifications for his or her job. All of our engineers are competent in their field and carry all necessary site certification with CSCS cards, IPATH, PASMA and scaffold towers. Our engineers strive towards excellence in each and every project they undertake.
Comprehensive Method Statements & Risk Assessment are generated for each and every project, and issued to our clients and installation team members.
Labels:
Camden Academy,
Flues,
Twin Wall
Airtherm Engineering Limited have designed, supplied and installed a 500mm diameter stainless steel, twin wall, fully welded gas and water tight Dinak DWhp flue system serving three high efficiency Clyde condensing boilers, with a total 2.2MW output load.
The system installed comprised of a 10m horizontal run and a 26m vertical, complete with the necessary drains incorporated to allow any unwanted condense to evacuate to the system.
The system was installed back in April 2012. Working closely with BAM Construction the installation was certainly a success.
The UCL Academy will be housed in brand-new, purpose-built accommodation on Adelaide Road in Swiss Cottage, North London.
The new building is specifically designed to support the curriculum and pastoral structures that the school will offer.
The Academy’s facilities include:
• State-of-the-art science laboratories, and a science demonstration theatre for interactive lectures, experiments and talks by visiting academics from UCL;
• An engineering science suite, which will include workshops and technology and science labs (for electronics and for engineering physics) designed to give students the experience of ‘being engineers’;
• Suites of rooms for art, music and drama, including highly-equipped performance spaces;
• ‘House’ spaces, providing comfortable, welcoming places for students to eat together, and to use for informal study during breaks and before and after school.